XV920 ATV

Modified the frame some more. Motor needs moving right about 10mm to match the drive axle up. Top frame rail will be bolt in.

4 faíscas

Tacked in

1 faísca

I'm beginning to get good at making these brackets with scrap metal and an angle grinder. They look thinner than they actually are. #xv920adv #virago #grindersfixall Next step. Welding!

0 faísca

Would you look there. Progress. That's the 2 bolt in mounts in place. Spacers worked out too. (I always keep old bearings, great for using as temporary spacers) The upper mounts need to be grinded then spot welded in. Then I'm going to my in laws to use the big Lincoln welder.

2 faíscas

Progress. 2 of the mounts work. The other 2 need trimming and welding in. Good stuff

3 faíscas

Baixe o aplicativo Wrench na Appstore e no Google play

Digite seu número e receba um link SMS único.