Modified the frame some more. Motor needs moving right about 10mm to match the drive axle up. Top frame rail will be bolt in.
4 sparks
I'm beginning to get good at making these brackets with scrap metal and an angle grinder. They look thinner than they actually are. #xv920adv #virago #grindersfixall Next step. Welding!
0 sparks
Would you look there. Progress. That's the 2 bolt in mounts in place. Spacers worked out too. (I always keep old bearings, great for using as temporary spacers) The upper mounts need to be grinded then spot welded in. Then I'm going to my in laws to use the big Lincoln welder.
2 sparks
Download the Wrench app on Appstore and Google play
Enter your number and get a one time SMS link.